Bathrooms

How much does a bathroom renovation cost?

A standard hall bathroom remodel usually runs $12,000 to $28,000, and a primary bathroom with a separate shower and tub commonly falls between $25,000 and $60,000. Keeping fixtures in their existing locations is the cheapest path; relocating a toilet or converting a tub to a curbless shower adds both plumbing and structural work. Small bathrooms are not proportionally cheap, because the same trades still have to visit the same number of times.

Reviewed by Owners & Homes · Published February 10, 2026 · Last reviewed September 2, 2026

Typical bathroom budgets

Cosmetic update (vanity, paint, fixtures)
$4,000 – $9,000
Full hall bath, same layout
$12,000 – $25,000
Primary bath remodel
$25,000 – $50,000
Layout change or curbless wet room
$45,000 – $85,000+

What affects the answer

  • Whether fixtures move. Relocating a toilet drain means opening the floor and reworking the waste line.
  • Tile area and tile size. Large-format and mosaic tile both slow installation for different reasons.
  • Shower construction — prefabricated pan versus a fully waterproofed, sloped mortar bed.
  • Hidden water damage behind the tub or under the toilet flange, which is common in bathrooms over twenty years old.
  • Ventilation and electrical upgrades required by current code.

What homeowners often overlook

  • The subfloor. Long-term leaks around tubs and toilets are found in a large share of older bathroom demos.
  • Waterproofing beneath tile, which is invisible when finished but is the difference between a ten-year and a thirty-year bathroom.
  • Having only one working bathroom in the house for three to five weeks.
  • Door and trim replacement, which rarely survives a full gut cleanly.
  • Special-order tile or a stone vanity top with a six-week lead time.

Questions to ask before hiring

  • What waterproofing system do you use in the shower, and is it warrantied?
  • What happens to the price if you find rot or a leak during demolition?
  • Will the bathroom be usable at any point during the work?
  • Are fixtures, tile and the vanity in the bid or handled as allowances?
  • Is a permit required for the plumbing and electrical work here?

A practical next step

Decide whether fixtures are moving, then set an allowance for hidden damage before you sign anything. Bathrooms surprise people more often than any other room.

This is general planning information, not an appraisal, engineering opinion, financial advice or a contractor proposal. Costs, timelines and property-value effects vary according to location, scope, materials, workmanship, property condition and market activity.